In the video below, we show you how to use the Smart Takeoff command to model overexcavation of non-native soils deposited on a site over time beneath building pads for new construction.
Starting with the building pad lines, we offset those using Multi Offset Line by 5’ to the outside to create the overexcavation envelope for each pad.
For the site, we built the Existing Ground Surface and then entered boring logs for each location where the Native Existing Ground Surface was encountered beneath each pad. Alternatively, this information could have been extracted from the geotechnical report for the site, if available. We now have a strata surface representing the base of the non-native soils (Native Existing Ground) below the current Existing Ground Surface.
The site has varying depths of non-native soils from 0’ to 6’ deep.
We then use the Overexcavation function of Smart Takeoff to calculate the overexcavation surface for a number of selected pads down to the selected strata surface. The overexcavation report shows, for each pad, the overexcavation quantity (soils to be removed), the granular backfill, and the net effect on the standard Cut / Fill calculations that needs to be accounted for.
The following video demonstrates: