Good morning or afternoon.
Completed:
Pipe Networks
Pipe Templates
Pipe Runs (all I5 " RCP)
Question :
The pipe network is a mix of new and ex pipe, inlets, etc.
When applying template, it will running the full length the network, new and ex.
Can a length limitation be placed on the template to a specific stop, without having to divide into multiple smaller networks? (See image below)
The example below, the template should run from the first inlet west to the manhole.
Thank you.
-Jason
You’ll have to divide it into separate runs to limit where the surface is built.
I think you can also create a blank trench template and put that where you want the surface to stop, but not 100% sure on that.
Thank you for the information. I will try the blank template on monday.
Each template has a start location - it will start at the station you tell it to start and stop at either the end or the next twmplate you define. A run can have any number of Templates. To stop a template create a new template where you want the template to stop and dont add any template details ie a null Trmplate.
If you want to skip a zone eg feom station 200 to 275 then place a null template at 200 and a full template at 275
Alan