Tieing a Driveway into a Walk

RPS Community,

Is it possible to take an Elevated Line (Originally Elevated from a Corridor) change the End Elevation and have it to into the line wherever 10% would hit? I built a Corridor, now I am adding Drives. The goal is to the walks and Curblines in appropriately.